Skip to content
Esc
Internships in Canada
New-grad roles in Canada
Remote roles
Roles that show pay
Postings at high ghost risk
PayWhat student tech roles in Canada pay
Check a linkPaste a posting to see its real age and ghost risk
JobsEvery open tech role
CompaniesWho fills fastest, who leaves postings up
Hiring calendarWhen employers open intern and new-grad roles
Skills gapWhat postings ask for that you don't have
Your resumeScore and fixes
Your matchesOpen roles ranked by your resume
ApplicationsSaved, applied, interviewing, offers
SettingsTheme, text size, motion
How it works

↑ ↓ to move, Enter to open? every shortcut

Keyboard shortcuts

CtrlKor/
Search employers, postings and pages
JorK
Next or previous posting in a list
O
Open the posting's page
Enter
Open it in the preview, on wide screens
S
Save or unsave it
?
This list
Esc
Close
Alphax

EV Charging Infrastructure Engineer (PE Preferred)

  • Seen live on Alphax's site today
  • Mid level
  • Remote
Pay
Not stated
Location
United States
Open for
6 days
First seen
Oct 29, 2026
Apply on Alphax's site (opens in a new tab)

Posting record

No flags

Open 6 days

The posting's record, oldest first
  1. Ghostless first sees this listing
  2. Last checked: still up
How we know

It hasn't been reposted, listed twice, or left up unusually long, and the posting doesn't say it's a talent pool.

Ghostless records the day it first sees a posting, so a repost can't reset its age.

Last checked Nov 4, 2026.

How well do you match?

See how much of this posting your resume shows, and what it's missing.

Upload your resume

What the posting discloses

Not stated: Pay, real vacancy, AI screening.

Why these three

Ontario requires postings from employers with 25 or more staff to state the pay, whether the vacancy exists, and whether AI screens applicants.

Some employers add pay only on their own site. Check the original posting before you rule it out.

About the role

AlphaGov delivers public-sector consulting for cities, counties, school systems, special districts, utilities, and related agencies. Our work spans classification and compensation, organizational and operational studies, research and program evaluation, economic and workforce analysis, surveys and community research, and applied data and infrastructure research.

We engage experienced practitioners as project-based collaborators. Engagements are remote-first with occasional client travel. When you authorize it, AlphaGov may name you as an expert collaborator or key personnel on proposals that match your expertise. We build ready teams for live pursuits — not speculative staffing banks.

AlphaGov is engaging an EV Charging Infrastructure Engineer for current public-sector EV charging studies and site design reviews. You will analyze electrical capacity, charger siting, make-ready needs, and interconnection constraints so agencies can build reliable Level 2 and DC fast-charging infrastructure.

We confirm scope, schedule, and fee with you before any engagement begins.

What you'll do

  • Review site electrical capacity, panel schedules, transformers, and service upgrades for charger loads
  • Produce or review EVSE layouts, single-line diagrams, load calculations, and make-ready scopes
  • Coordinate utility service planning, interconnection applications, and meter or rate options
  • Advise on Level 2 and DCFC hardware selection, power sharing, and code compliance (NEC, local AHJ)
  • Support cost estimates for electrical upgrades, trenching, and charger installation packages
  • Flag constructability, safety, and accessibility issues before agencies bid or award install work
  • Contribute qualifications and past-performance narrative to AlphaGov proposals when you authorize naming

Apply to be considered.

Requirements

Required

  • Professional experience designing or reviewing EV charging electrical infrastructure for agencies or commercial sites
  • Working knowledge of Level 2 and DC fast charging, load calculations, and utility make-ready requirements
  • Ability to interpret single-line diagrams and produce engineer-ready findings an agency can act on
  • Comfortable as a 1099 project-based consultant, remote-first with occasional site visits

Nice to have

  • Licensed Professional Engineer (PE) in electrical or a closely related discipline
  • Experience with municipal, county, transit depot, or highway corridor charging projects
  • Familiarity with NEVI, CFI, or state EVSE design and compliance standards

Something wrong with this posting?